New equipment
Safe by design,from the first sketch to startup.
A new machine is the best chance you’ll get to design the danger out, and the easiest one to rush. Management of Change follows it from the idea, through the supplier’s shop, to the day it starts. When a supplier builds it, two gates stand in its way: the Factory Acceptance Test (FAT) at their shop before it ships, and the Pre-Startup Safety Review (PSSR) at yours before it runs. Neither one is skipped.
Read it as text
- Conception. The new machine is laid over the Risk Map before anyone builds it: a robot to take parts out of IMM-2 is a serious change. The guards go on the supplier’s drawing: a fence around the cell, a gate with a safety switch, a lockout point. The design check is signed.
- Fabrication. The Factory Acceptance Test (FAT) tries every new guard at the supplier’s shop. One isn’t right, and it’s fixed before it ships. Only then does the FAT gate open.
- Installation. The Pre-Startup Safety Review (PSSR) walks it at the machine: each new guard seen working, the startup crew shown how to stop it. Someone who didn’t ask for the change signs startup, the PSSR gate opens, and the robot goes on the Risk Map with every new guard already checked once.